Agile Values and the Scrum Framework

This skill provides an in-depth exploration of Agile values and the Scrum framework, focusing on how these elements guide decision-making and project management in complex environments. It covers the integration of Agile values with Scrum's theory, values, and framework, emphasizing the importance of transparency, inspection, and adaptation. The skill also delves into the roles and responsibilities within a Scrum team, the significance of Scrum events, and the application of Scrum values such as commitment, focus, openness, respect, and courage. Through practical examples and case studies, learners gain insights into effectively applying Scrum principles to achieve project goals.

Full skill from Certified ScrumMaster. Preview the training IT teams trust.

Updated

50m

Skill 1 of 10 in Certified ScrumMaster

What you'll learn

  • Agile Value and Principles in Plain Language
  • Empiricism and the Three Pillars of Scrum
  • The Five Scrum Values in Practice
  • The Complete Scrum Framework
  • One Sprint, from Planning to Adaptation

Free 50-minute video lesson with a full transcript and knowledge checks. No account needed to watch.

Introduction

Welcome to the Bob Show and the supplemental course for the Certified Scrum Master! You’ve probably heard the Scrum terms before but we're going to talk about them anyway. The real question is whether you can explain how the pieces work together and recognize when a team is missing the point.

We’ll connect the Agile values and principles to Scrum’s theory, values, and framework, then follow Orion through one Sprint. I'll explain who Orion is in just a moment. You’ll finish by filling out a quick Scrum Framework Check and then we'll move on down the road. Ready, set, go!

Agile Value and Principles in Plain Language

The Agile values sound reasonable when you read them. Applying them gets more interesting when a team faces a deadline, a changing requirement, or a process that slows everyone down.

Let’s put the four values and twelve principles into everyday language and connect them to choices people actually make. Pay particular attention to what the values prioritize and what they still consider useful.

Knowledge Check

The Orion Team uses a detailed workflow and a digital board, but a confusing requirement remains unresolved for several days. Which response best reflects the Agile value concerning individuals and interactions?

Empiricism and the Three Pillars of Scrum

A reasonable plan can run into an unreasonable amount of uncertainty. That happens. What matters is whether the team can see what’s happening and make a useful adjustment.

Using Orion’s integration delay example, we’ll trace transparency, inspection, and adaptation through one decision. The goal is to understand how the pillars work together, rather than just remember their names.

Knowledge Check

Developers discover that their current plan is unlikely to achieve the Sprint Goal. Which response best demonstrates adaptation?

The Five Scrum Values in Practice

The Scrum Values become easier to understand when something goes wrong. Who speaks up? Who listens? Does someone help, or does everyone retreat to their own task list? We’ll use an example to explore Commitment, Focus, Openness, Respect, and Courage. Watch how several values can shape the same response.

Knowledge Check

A clinic representative questions a design decision. The Developers disagree but ask about the clinical impact and consider the explanation carefully. Which Scrum Value is most directly demonstrated?

The Complete Scrum Framework

Now let’s put the pieces on one map. Accountabilities tell us what people are responsible for. Events create opportunities to plan and learn. Artifacts and commitments make the work, direction, and quality understandable. Follow the connections as we build the framework. Those relationships will help you make sense of situations that a list of definitions can’t explain by itself.

Knowledge Check

Match the following product artifacts with their commitments.

This interactive assessment is available in the full learning experience.

Want to answer questions like this yourself?
with no purchase required. Already have an account?

One Sprint, from Planning to Adaptation

Let's wrap this skill up with a walkthrough of a fictitious Sprint with the Orion Team. In the current sprint, Orion has a useful goal and a reasonable plan. Then an integration delay changes what the team can do. Sound familiar?

Let's follow the team through that Sprint, including the adjustment, the usable result, and the feedback that follows. You’ll see how a clear goal can guide decisions even while the plan evolves.

Knowledge Check

Which of the following is a reason to adapt the Sprint backlog?

Test Your Knowledge

Knowledge Check

Which two statements reflect principles behind the Agile Manifesto?

Select all that apply.

Knowledge Check

The Orion Team has an accurate view of a delivery risk and discusses the consequences, but continues with the same failing approach. Which pillar is most clearly missing from its response?

Knowledge Check

Who is accountable for maximizing product value and effective Product Backlog management?

Knowledge Check

Which distinction between the Sprint Review and Sprint Retrospective is correct?

Knowledge Check

The Scrum Master is basically considered the Scrum framework police.

View Transcript

Introduction

0:00All right. Welcome to skill number one of the Supplemental Certified Scrum Master course. I'm Bob, the hostest with the mostest. And let's be clear. If you've taken one of the Scrum Alliance CSM courses, you can take the CSM test, pass, go on about your life. But if you need additional study, or you just aren't clear, or you're nervous, maybe this is the course for you. I've been doing this a long time. And the one thing I can tell you is many of these certs are very, very similar. They simply have different requirements about how to prep for them.

0:40So this is one way. This first skill is all about the agile values and the Scrum framework. I'm going to walk you through it. Easy peasy, lemon squeezy. I'm going to use a fictitious company called PulsePoint Medical. I made them up. But the reason I did that is because then I have a single case study I can apply anywhere. I have found that over time, too many different case studies start to confuse people because whatever looks good in this industry might not work in that one, or this particular project, or this particular structure. So I try to keep it simple because, well, I'm simple, too. So let's start with the reason behind the framework. You may have already guessed that there are Scrum events and terminology from your live CSM course. This skill is going to connect those pieces to the thinking and the reasoning behind them. Knowing what happens at the daily Scrum is useful, but understanding why that event even exists helps you recognize whether you're accomplishing anything. So Scrum works with complex work. You might be thinking, well, I grew up on Waterfall or Predictive. Well, so did I. And if you have heavy engineering oversight, or

2:00regulatory oversight, or heavy documentation, or strong mathematical precision that's needed for infrastructure, then Predictive work, Predictive methodologies, are the way to go. Plus, you kind of have to on many of them. But on software and some hardware, you can use Scrum. Let's face it, when you develop something new, you rarely know everything right up front, and anyone telling you that you do is probably not the person trying to build it. Over time, the customer needs become more clear. Technical assumptions that you hold right now might be proven wrong, and feedback might just reveal a better direction. Scrum gives the team regular opportunities to use that information and benefit from it. And then we have the Agile Values. You've probably seen the Agile Manifesto, and it describes preferences that navigate this kind of work more effectively.

3:03It's how you might produce more useful results, or collaborate with customers, or respond to change. Those preferences influence everyday decisions about how people work together, and Scrum simply provides a framework so you can put that learning to work. Scrum is going to give you different accountabilities, events, artifacts, commitments, and every one of them has a purpose, and that relationship matters. If you change any of them, you are now doing something that is Scrum-adjacent.

3:38You have drifted away from Scrum, but the rules are very broad. However, the accountabilities, events, artifacts, and commitments, they're pretty clear. So we're going to connect them to transparency, inspection, and adaptation. I remember them with TIA. It is all about empiricism. Learning by doing, and then doing it again, and learning more, and then doing it again. It sounds very much like the Deming Cycle. Plan, do, whoops, I think I remember the Deming Cycle. Plan, do, check, act. The wheels on the bus simply go round and around. We plan something, and then we do it, and then we learn from it. We check. Did it work out the way we thought it would? Is there a variance, positive, negative, negative variance, or zero variance, excuse me, and if there is, we do something about it. We act. Empiricism is the same way. So throughout this skill, I'm going to use a very specific PulsePoint medical team called the Orion Team. And once again, I made PulsePoint up.

4:50They don't exist, but in my head, what they do is make wearable, trackable devices for healthcare monitoring of heart patients. Let's say you're wearing this device, and you start having palpitations. It sends an alert to the PulsePoint medical team, and they can take appropriate action. Maybe that's call 9-1-1. Maybe that's call you directly. Maybe that sends you some sort of text alert that says, hey, stop doing CrossFit because you're about to die, whatever it is. So I'm going to use the Orion Team throughout this entire course, excuse me. So I think that's it. I think that's how I'm going to set the foundation and look. I'm not everyone's cup of tea. I kind of wing this as I go, but I know a lot. I don't know if all that I know is true, but I do know a lot, and I've been doing this a long time. So hopefully, my benefit is that I can tie what can be complex concepts to some pretty simple and straightforward talk. With that said, let's get to it. Here we go.

Agile Value and Principles in Plain Language

0:00All right, let's jump right into section one and let's talk about the Agile values and the principles in very plain language, because that's the language I speak. So Agile gives people guidance for making decisions. That way we're not just making it up and we're being inconsistent. The Agile manifesto, and the link is below somewhere, presents four values and 12 supporting principles. Together, they describe preferences for developing software when collaboration, feedback, and change matter. So a value helps people decide what deserves greater emphasis. I value this over that. A principle makes that preference more concrete through behavior, but the team still needs to organize their work and Scrum applies that framework. So let's say the Orion team has a meeting schedule and they always show up, they always have it, but customer feedback never changes their product decisions. The schedule alone might be good, but it doesn't tell us anything at all about the team's behavior as it relates to the customer and how they are supporting them. So let's move on to the first

1:17value. Where's Mr. Penn? Here we go. We have individuals and interactions over processes and tools. Well, that's pretty simple because this down here is predictive. Processes and tools, and there are plenty of reasons to do that. If you have hybrid projects, you can do both, but Agile. Individuals and interactions. Got it. Processes and tools are useful and their usefulness depends partly on whether they help people work together. You might have a Kanban board and it shows you where an item is blocked, but the people still need to talk about why it's blocked and do something about it. A workflow can clarify the responsibilities of the team through explicit policies, and this is just one example, but we still need room to coordinate.

2:09Here's an example. Let's say a developer has a question about a clinical requirement. You can log that question and that's useful. You can track it. You've captured it and all of that stuff, but if you have to wait several days for that ticket to move through the queue, how long is this conversation going to be delayed, leading to how long it takes us to resolve it? I think you get my point there. And then we have working software over comprehensive documentation.

2:40Working software. That starts to feel a lot like empiricism. Learning by doing, and if it's working, we can learn from it. Documentation can support understanding, maintenance, safety, and compliance. A useful result lets people examine it so they can see if the solution actually works. Maybe there's a detailed specification that describes an intended result. Did you achieve that result? Working software lets people test that intention. Can they test it? So the documentation should serve a purpose appropriate to the product and the environment. And let me clear up my board because it's getting kind of muddy here. Let's say that Orion has a complete document describing a patient check-in feature, and when staff tries a working version, they discover that it doesn't work the way the documentation says it should. I think you get my point on that one. And then we have customer collaboration over contract negotiation. And yes, I paraphrased some of these, but you know where the Agile Manifesto is, so let's not get hung up on that. Agreements establish expectations. Ongoing collaboration helps clarify the needs as people learn and as things change,

4:02and they almost always do. Plans provide direction, but new evidence normally justifies changing that approach. Responding to change requires judgment about value, timing, and consequences. Let's say the clinical staff discovers that an accessibility issue matters more than a planned convenience feature. So the Orion team discusses the evidence with the product donor and the stakeholders so they can adjust future work. What it means is we're not just going to set up a list of things we're going to do in the product backlog and then the sprint backlog, and then never adjust as the evidence changes. Obviously we're going to do that, and if you're not doing that, well, you're probably violating empiricism. The last one is responding to change over following a plan, but I think I talked about that one just a moment ago as well, so let's leave that alone. And then we have the 12 principles grouped together. The first three are right there. Deliver and learn, because that's what they sound like you're doing. Satisfy customers through early ongoing delivery. That's incremental delivery. Got it. Welcome changing requirements

5:20even late, and I always love that word, welcoming change. On the predictive side, no, not so much. And then deliver working software frequently, incremental. That makes sense to me. And then we have the next set. Actually, if I'm counting the digits, this is the next set. Collaborate and support people. Business people and developers collaborate daily. That makes good sense to me, because as things change, we need the fastest, most updated information so we can adjust accordingly to meet the customer's needs, whether that customer is internal or external.

6:01Then we have support motivated people and trust them. Trusting them leads to self-management and transparency, and I talked about transparency a moment ago. And then we have we favor direct face-to-face conversation. Absolutely, because then you have the benefit of body language as well as spoken language. So let's then sustain progress and quality. And yes, we're doing all of these together simultaneously. I'm just trying to break it down, Jackie Brown. Working software is the primary progress measure. If we're delivering it, we are moving in a direction.

6:41It might be the wrong direction, but we're still moving forward. If we're not delivering anything, how can we sustain progress and or quality? And the answer is we ain't. Maintain a sustainable pace. It shouldn't be go real fast, then real slow. Go real slow, then real fast. You need to ramp into that pace and then maintain it. And then technical excellence and good design enable agility, the ability to adapt. Agile, fast, flexible, bendable, Gumby. You know what I'm talking about.

7:20And finally, we have the final set over here. Simplify and improve. Maximize the amount of work not done, meaning we need to maximize the value of the work we are actually getting done. Think of the Moscow method. Must have, should have, could have, won't have. I think you understand that one. And then let self-organizing teams shape their solutions. There are accountabilities between the scrum master, the product owner, and the developers. If you violate them and wade into someone else's, you know, swim lane, they're not self-managing or self-organizing anymore, which means usually you're going to step on transparency, inspection, and adaptation.

8:08Never mind violating the scrum accountabilities. And then we reflect all the time and adjust behavior. Go back to the Deming cycle. Plan, do, check, act it. We will reflect when we check and then we will adjust all the time when we act. I think that'll do it. I'm sorry about the scribbles, but I think a lot of it, maybe even most of it, made sense. With that said, I will see you in the next section.

Empiricism and the Three Pillars of Scrum

0:00All right, let's jump right into section two and let's talk about empiricism and the three pillars of Scrum. And yeah, I'm just trying to be, you know, overly emphatic about that because it's kind of cool. So, complex work requires decisions before everything is known. Most of the time, teams begin with incomplete information about customer needs, technical challenges, possible solutions. That doesn't prevent planning. It means plans contain assumptions that need to be tested.

0:34So, what is an assumption? An assumption is a belief you hold to be true or false in the absence of proof. And if your belief turns out to be the opposite of reality, you normally end up with the risk event. I think you understand it. Oh yes, I have exactly 15 minutes to get to work, but I believe that this particular road is going to be the fastest. But then you get to that particular road and there's a roadblock or it's closed because of construction. Excuse me, I think I bit my tongue.

1:06You can see how, if that happens to you, your assumption was wrong and now you have to deal with it. So, a solution might look promising, but disappointing when people actually use it. And a task, something you have to do, an activity can look very straightforward, but then you have an external dependency tied to it. Suddenly it's not so straightforward. And your experience can help you make some good choices, but it does not remove uncertainty.

1:39And when I say uncertainty, I'm meaning the unknown. And by unknown, I mean risk. For example, let's say that the Orion team expects a new patient check-in feature to reduce front desk effort, but the staff feedback reveals that the feature creates extra work when patients arrive without completing the online form. So the best of intentions didn't work out the way they thought. So empiricism means learning from doing.

2:12Pretty simple. It means knowledge comes from experience and decisions based on what is observed. We did something, we observed it, now we are learning from it. So teams make progress. They look at the results and then they use the evidence to guide their next set of decisions. And sometimes if you've ever heard of the phrase experiment, you are trying to do the least amount necessary to make the next best available decision. You're not gonna do it all.

2:43You're going to do just enough to see which way you should go through the woods. Forecasts and assumptions give us a starting point. Observable results though help the team test those assumptions and new evidence should A, support our direction or B, suggest a change. Scrum is founded on empiricism and lean thinking. Lean thinking emphasizes reducing waste and focusing on what matters. Together, they support learning while directing effort towards useful results.

3:19So let's talk about transparency. This is where we are transparent about everything happening. We're not hiding it. We are airing our dirty laundry. It means the important aspects of work are visible and understood by the people doing the work and receiving the results. People need clarity about the goal and the current state of work. So we have to be honest about it. When you say finished, everyone needs to understand what that means.

3:52So you need to be transparent about what it means upfront and agree upon it. Problems or risk events need to be visible as soon as possible so they can support the next set of decisions. And visibility alone is insufficient. A dashboard can be available to everyone while people look at the numbers and think they mean different things. So transparency, that's a very good one. That's also the first part of TIA.

4:22Then we have inspection. Let's take a look at it. Inspection means taking a look at or examining the scrum artifacts and the progress towards an agreed upon goal. Are we detecting? Are we seeing? Do we pontificate? No, that's the wrong word. But are we seeing undesirable differences or problems? A goal gives people something meaningful to inspect against. Inspection considers the work and the results.

4:55Basically, we are looking for any variance, the difference between what you were trying to do and what you actually did. Scrum events provide regular opportunities for inspection while teams also inspect the work as it unfolds. So you have daily inspection and then framework inspection opportunities. Let's move on to adaptation. Let's get a different color. Adaptation means adjusting when the work or the results move outside of acceptable limits, meaning you have a negative variance or too much of a positive variance.

5:33And yes, that can be a problem. Useful adjustments should happen promptly enough to prevent future problems. Developers might change their plan for achieving the sprint goal if they get a negative variance or a negative outcome or result that they didn't expect. They learn from it, they change, they adapt. Product learning, how people interact with it, might influence the order of future work. They might love this feature and ask for something better or something adjacent to it.

6:06They might hate this one. So we learn. The team might improve a practice that's causing recurring delays because they learn from it. So people need the authority and the ability to act on what they might discover. Inspection has limited value when every adjustment must wait for someone outside the team. So the three pillars, transparency, inspection, adaptation, depend on one another. Weak transparency can produce misleading inspection.

6:38Inspection helps people recognize when adaptation is needed. And adaptation gives practical value to what inspection actually reveals. And so the wheels on the bus simply go around and around. Transparency, inspection, adaptation, which also looks a lot like the Deming cycle. Plan, do, check, act. I'm gonna talk about it more. So scrum on its own provides several opportunities to inspect and adapt.

7:11That's why we have scrum events. Sprint planning, well, that's where we establish a valuable sprint goal based on the current understanding. Then we have the daily scrum. We inspect progress towards the sprint goal and adapt our plan every day if we need to. Then we have the sprint review. We inspect the sprint outcome, the increment, and talk about future adaptations with stakeholders. And then we have the sprint retrospective.

7:42That one's all about how the team's processes worked and how the people worked together. People get confused between the sprint review and the retrospective. The review is all about the product. The retrospective is all about the process and the people. So let's say this is Orion's sprint goal right here. Enable the clinical staff to identify missing patient information before appointments. Well, what are we trying to do?

8:13Identify missing patient information. Who's trying to do it? That would be the clinical staff. And when are they trying to do it? Before appointment. The how is all about what we're trying to do. That's going to take us there. So what do we do to get there? We make it transparent. We show any dependencies, any unfinished work, and likely effects on the goal, good or bad. And then we inspect it. We examine what remains possible and whether the current plan that we're on will actually get us there.

8:47Because if it doesn't, we can move on to adaptation. The devs, the scrum master, the product owner, whoever discusses possible options that will take us closer to the sprint goal. We might start on a path and then deviate. At some point, we need to stop that deviation and then move back in the direction of the sprint goal. So we have transparency, inspection, adaptation. What do we do again? We continue to be transparent.

9:18We inspect it again, and then when and if necessary, and it's always really when, we simply adapt one more time. And once again, the wheels on the bus go round and round. Transparency, inspection, adaptation, the three pillars of scrum.

The Five Scrum Values in Practice

0:00Let's do it one more time. Let's jump into the five Scrum values and how to actually use them. So the values influence how people use the framework. Scrum does provide the structure, but people decide how honestly and effectively they use it. The five Scrum values guide their work, their actions, and their behavior. And I love this top line right here. The Scrum values become visible in behavior. Let's say you have a friend who says, I'm on a very strict diet and I will not waver. And you're like, dude, I just saw you eat a giant piece of seven layer death by chocolate cake at the cheesecake factory. So don't stand there and tell me that you're on your diet.

0:47You see the difference? It's the difference between talking the talk and walking the walk. There's what we say we're doing. And then there's what we actually do. Well, that doing, that's the behavior. So let's move past that. And now I want a piece of cake. So openness helps important information become visible. Respect and courage help people examine difficult information together where we address the problem and not make it personal. You know, the difference, and I know you've seen it. Commitment and focus help the team pursue its goals and act on what it learns.

1:27So commitment means working towards a shared goal and supporting one another. Scrum team members commit to achieving their goals and supporting each other all the time, not just when it's convenient. And that commitment should be visible in how they coordinate and respond when work becomes difficult. Remember, this is complex work, meaning there will be times when it's a fire drill. It is not always peaches and sunshine. So team members take their shared goals seriously because they are professionals. Plus they are a team. They help resolve problems that threaten sprint goals or problems that threaten the integrity, the cohesiveness of the team. And they communicate when an expectation or an assumption is no longer realistic. Commitment doesn't make uncertain work predictable or turn every selected backlog item into an unconditional promise. It means we are committed to figuring it out in the most professional, respectful way together. And we're going to talk about respect in just a minute. Then we have focus. We're focused on the sprint goal.

2:40That's why we have a target right there. The Scrum team's primary focus is on the work in the sprint to make the best possible progress towards that goal right there, whatever it is. And I probably could have just done that. That is your target. So the sprint goal helps connect individual tasks to a shared purpose. Focus helps the team evaluate interruptions and competing requests because we get fire drills all the time. And it should support decisions about where our attention will have the greatest effect. Easy peasy, lemon squeezy. And then we have openness, making work and the challenges discussable. The Scrum team and its stakeholders need to be open about the work and the challenges involved. We can't be pencil whipping or putting eyewash on the wall that says, yeah, we got this. And you know who I'm talking about. People raise uncertainty and problems while there is still time to respond. We've been open about it. We didn't hide it until it blew up in our face. Team members can also acknowledge mistakes and ask for help. We are not all equally capable at the same time. Sometimes we're more experienced. Sometimes we are less experienced.

3:58And sometimes we're having some sort of personal crisis at home that's getting in the way of how we're doing work. And yes, I know we should separate personal and professional. But come on, you're one person. How can you separate the two things happening inside your one brain? And the answer is, you're off topic, Bob. So just move forward. Openness depends on how people respond. If you punish someone for surfacing a problem, you're going to make future transparency a lot harder. And then we have respect. R-E-S-P-E-C-T. Find out what it means to you and me.

4:38I know I altered that, but I think I sounded pretty good. And I also inadvertently made my marker very fat. So let me change that. We need to respect one another as capable, independent people and respected by and towards the people we work with. Respect is a two-way street. If you get it, you will give it. You know what I mean. So we need to listen to expertise and perspectives that might be different from our own. But we also need the ability to challenge an idea professionally. I am not attacking you. I'm saying your idea has some holes in it. And then we need to allow people to exercise judgment within their specific accountabilities. We need to trust that the product owner is doing what he or she is supposed to do. The same with the scrum master.

5:30The same with the developers. And I feel like I'm overly excited about this. Respect does not require agreement. Productive disagreement can improve a decision when people look at the reasoning together. This is why I said what I said. This is the evidence. Oh, well, I think you're stupid. Nope. Scratch all that. We just went back to reality land, and we're not doing that. We're talking about the scrum values. Finally, we have courage. And let's see if I got this right. Yep, I did.

6:04Courage helps people address difficult problems. Because remember, this is complex work. We need to have the courage to do the right thing and work on tough problems independently and together. We need the ability to raise risk events that other people might want us not to talk about. We need to question assumptions when the evidence doesn't support it. We need to protect quality when pressure is encouraging a shortcut. And we need to admit it when help or a change of direction is needed. We are not all in all the time no matter what. We need the courage to say something.

6:43So several values can support the same decision. Let's say the Orion team discovers that a patient data defect is actually threatening the sprint goal. If we have openness, we can talk about that defect and the likely impact. If we have respect, we can listen to people who understand the technical and clinical risks. If we have courage, we can raise that quality concern despite delivery pressure. If we have focus, we can direct attention towards the most important work towards the sprint goal.

7:18And if we have commitment, we can coordinate and support one another through whatever the response turns out to be.

The Complete Scrum Framework

0:00Welcome to section four. Let's jump into the complete Scrum framework. So Scrum is a lightweight framework, we know that, that helps people generate value through adaptive solutions to complex problems. The elements work together to provide direction, make progress understandable, and create opportunities to learn. We have the accountabilities, what people are responsible for. We have events, a regular rhythm for planning, inspection, and adaptation. We have the artifacts, which make important information about the work or the value visible to everyone.

0:41And then we have the commitments, they provide focus and a basis for inspecting progress. Scrum leaves plenty of room for teams to choose useful techniques within that framework, perhaps Kanban. Those techniques may vary within the product, the solution, the industry, the team, whatever it is. So we have one Scrum team with different accountabilities. The product donor is accountable for maximizing product value. They're also responsible for effective product backlog management. Why does that matter? Because on the CSM exam, if I were a thinking man, I would think they would offer anti-patterns, meaning the Scrum Master is responsible for maximizing product value and dealing with the product backlog. That would be an anti-pattern, and an anti-pattern is something that you shouldn't be doing. The Scrum Master establishes Scrum.

1:43Are we following it? That's it. Well, there's a lot more to it than that. Think of them as the daily Scrum police. Are we showing up at the daily Scrum? Are we sticking to the sprint length? Are we following the accountabilities? Are we doing everything we're supposed to do that will lead us to the sprint goal within that framework? If we're not, whoop, whoop, you get a ticket. And then we have developers. They're accountable for creating a plan for the sprint. They maintain quality through the definition of done, meaning we've achieved quality, and they adapt their plan towards the sprint goal. They also hold one another accountable as professionals. So developers include the people who do the work needed to create the increment, but the term extends beyond programmers. The Scrum team is cross-functional and self-managing, so they may have skills with development, testing, design, whatever it is. That takes care of that. Let's move on to the sprint. And we are talking about this fella right there. The sprint is one month or less, and a new sprint starts immediately after

2:58the last one stopped. So I think of it as the container event because sprint planning, the daily Scrum, the sprint review, and the sprint retrospective all fall inside of it. What are we doing in the sprint? We're doing the work necessary to achieve the product goal within that sprint, you know, or whatever incremental delivery that we're doing. The sprint goal is a small piece of that product goal, and that's giving us our objective. And as the team learns, scope can be clarified and renegotiated with the product owner without affecting the sprint goal. It is a rare thing when the sprint goal is abandoned, but let's not worry about that. That is reality-based stuff. And along the way, quality shouldn't decrease. Any changes we make because of the daily Scrum happening within the sprint should not endanger the sprint goal. Well, then we have planning. You don't do anything without a plan. This is the why are we doing this, meaning why is it important? That's our sprint goal.

4:09What are we trying to do? Well, let's look at the product backlog items that the product owner has, and let's see which ones we can pull into our sprint. And then we have the how. We need a plan. This is what we're trying to do. This is why it matters, and this is how we're going to do it. And along the way, we have the daily Scrum. It is our 15 minutes of daily fame where we get together and developers talk about their progress towards the sprint goal. And if we need to adapt the sprint backlog based on everything we've learned, then we will do that. The when and where is completely up to the team, but it's normally suggested that they do it at the same time in the same place to reduce complexity. Let's move on to the sprint review. The sprint review is all about the product, the increment. This is where we inspect it with the stakeholders and consider future adaptations. We are all focused on the product goal. Think of it as strategic vision.

5:19Well, our incremental delivery within each sprint is going to take us closer and closer, but if we're deviating, we will adapt. And then we have the sprint retrospective. That is about the process. That is about the people. Is there something wrong with the process we need to change, or is there a way we can work together more effectively? Next, let's talk about the artifacts and their commitments. The product backlog is for the product owner. Very simple. That is their artifact, their documentation, if you will, that they are responsible for, ultimately responsible for it. But their commitment is the achievement of the product goal. Can't have one without the other. Think of your product goal as the North Star that the team keeps aiming at. Sure, we might zigzag from time to time, from sprint to sprint, but we are always moving generally towards that.

6:24And if we aren't, something has to change. Well, then we have the sprint backlog. The sprint backlog belongs to the developers, and it's the work they think they can get done within this particular sprint. And then we have the increment, whatever we are going to hopefully inspect, maybe working software, during the sprint review. The commitment is that it will meet the definition of done, which usually means something working, something within a predetermined level of quality, if you will, and we can actually see it, play with it, test it, provide feedback on it.

7:02Yeah, obviously, along the way, transparency, inspection, adaptation, along with the values, commitment, focus, openness, respect, and courage.

One Sprint, from Planning to Adaptation

0:00Welcome to Section 5. Let's walk through a fictitious sprint from planning through adaptation. Hopefully this will put some of these pieces together for you, and actually it should if I say it right. So yes, this is going to put those pieces together. Let's try that. So let's start with a product direction and a meaningful need. So PulsePoint Medical, the company over the Orion team, wants to help clinics prepare patients before their appointments. So their product goal, think of it as strategic, is to improve patient readiness by making missing information easier to identify and resolve. So the product backlog contains potential improvements that support this direction. The product owner then orders the backlog to reflect current understanding of value and needs. Refinement helps make upcoming items understandable and small enough to complete within the sprint. So the Scrum team then considers what useful progress it might make. Again, product goal, high level. We have to start somewhere. That is the company, PulsePoint Medical's North Star.

1:17So then we go to sprint planning. This is where we connect value, selected work, and a plan. So the Orion team discusses why the sprint will be valuable, what they might do within that time frame, and how the selected work might get done. Along the way, they come up with a sprint goal. And here it is right over here. Enable clinic staff to identify missing patient information before appointments. They've taken that strategic goal, broken it down into a sprint goal, something small for incremental delivery. That's just where we are and it might change as we learn more and adapt. So developers go back to the product backlog items and they talk about it with the product owner. They think about capacity, past performance, and the definition of done, the quality standard.

2:10Is it something they can hit within a sprint? Because if it's not, something has to change. So then developers create a plan to deliver that selected work and the sprint goal is their shared purpose. Tracking so far? Good, because I'm having fun. Well, developers coordinate the work and they keep the quality visible. Developers manage how to create the increment because they are self-organizing and once again self-managing. They coordinate across the skills needed to deliver a usable result, which means they update the sprint backlog as their understanding changes.

2:51They work through design, development, testing, and integration as needed. They use the definition of done to guide the quality level they are trying to achieve and they can clarify questions at any time with the product owner through the sprint. Along the way, we have the daily scrum. Easy peasy. What are we doing there? We are inspecting progress towards the sprint goal and adapting our plan if necessary. For example, we're asking, does the current plan still work? If it's yes, we go forward. If it's not, we discuss why and we adapt.

3:30Do we need to coordinate over any obstacles or any external dependencies? I don't know. And if we do or if we don't, do they affect progress? I think you get the point. If Orion has to change anything, they do and they take that adapted plan and they go forward. Any other detailed information they need or coordination, they can do it after the scrum. Easy. But what happens if new evidence changes the plan? Let's say there is an external data connection delay, meaning a third party vendor can't pull it off or something happens or there was a hack or whatever it was. So now that they have new evidence, the developers and the product owner talk about it.

4:18While they're talking about it, they find out that the clinic's existing data can support a more narrow but useful solution. So they talk about what scope changes they need while preserving the sprint goal. The developers revise the sprint backlog to reflect the new approach and the team continues aiming towards the definition of done. The product owner then considers whether a deferred capability belongs in the product backlog. So they've adapted and created a usable increment. How do we know it's usable? Well, they inspect it. It works with the existing product. It is usable and it meets the required quality measures. It represents a small incremental step towards the product goal and it can be released before the sprint review when appropriate. Awesome. So they go to the sprint review. They talk about it with the stakeholders and they inspect the sprint outcome and discuss what they might do next. They look at the progress towards the sprint goal. Are they moving in the right direction? The clinical staff, after they play with it, talk about what they observed when they use that feature. Then they consider changes

5:38might be to the particular need or within the environment itself and that discussion may lead to adaptations within the sprint backlog. I got off track there for a moment but I'm back. So then we move over to the retro, the retrospective that is. How did the team work together? We talk about the people, interactions, processes, tools, and the definition of done. If we didn't achieve it, obviously we need to examine why. Was it the people? Was it the process?

6:11Or was the definition of done too hard to begin with? We also take a look at this external data dependency. How come we didn't see that coming? Or we did see it coming and we didn't elevate it? Or it was fine and then something happened? We also identify practical improvement to the process and the people. And the next sprint begins immediately after that. So once again, the wheels on the bus go round and round. And I know that was a completely made-up hypothetical situation, but I think you get the point.

Frequently asked questions

What does the Agile Values and the Scrum Framework lesson cover?

The lesson covers empiricism and the three pillars of Scrum, the Agile values and principles in plain language, and the five Scrum values in practice. It then walks through the complete Scrum framework (accountabilities, events, artifacts, and commitments) and follows one sprint from planning to adaptation, using a fictitious PulsePoint Medical team called the Orion Team as a single case study.

How long does the Agile Values and the Scrum Framework lesson take?

The lesson runs about 50 minutes. It is one part of the Certified ScrumMaster (Scrum Alliance) course, whose timed modules total a little over eight hours of video, which most learners finish over two to three weeks alongside regular work.

What background does a team member need before taking this Scrum lesson?

The trainer assumes the learner has met Scrum events and terminology in a live CSM course, and this lesson connects those pieces to the reasoning behind them. Team members who grew up on Waterfall or predictive methods are addressed directly, so that background works as a starting point.

When should an IT team use Scrum instead of a predictive or Waterfall approach?

The lesson explains that predictive methods fit work with heavy engineering or regulatory oversight, heavy documentation, or strong mathematical precision, such as infrastructure. Scrum fits complex work like software and some hardware, where customer needs become clearer over time, assumptions may prove wrong, and feedback can reveal a better direction.

What is the difference between the Sprint Review and the Sprint Retrospective?

The Sprint Review inspects the sprint outcome, the increment, and discusses future adaptations with stakeholders, so it is about the product. The Sprint Retrospective looks at how the team's processes worked and how people worked together, so it is about the process and the people.

What can a Team Lead or new Scrum Master do after completing this lesson?

A team member can explain Agile values and how the Scrum framework puts them into practice, describe how empiricism tests assumptions, and trace how a product goal flows into a sprint goal and sprint plan. This gives an IT Director a shared foundation for the later course modules on accountabilities, events, the Definition of Done, and impediments.

Team training path

Turn this skill into assignable team training

This free skill is a preview of the courses your team can assign, track, and report on with CBT Nuggets.

What's next?

Ready to keep going?

For your team

Bring this training to your team

See how CBT Nuggets helps IT teams close skills gaps, hit compliance targets, and prove training ROI.

Book a Demo
Just need Certified ScrumMaster?

Learning on your own? Browse individual plans ($49/month, billed annually) →

Not ready to buy?
with no purchase required. Already have an account?
Book a Demo