What is Project Management

Project+ and how to prepare for the exam

Pre-Project Setup

Project Planning

Prepare Scope Statement

Create WBS and WBS Dictionary

Define Change Management Process

Develop Project Schedule and Resources and Roles

PERT/GANTT/CPM and Schedule Compression

Communications Management Plan

Risk Management Plan

Quality Management Plan

Cost Management Plan

Procurement Management Plan

Transition and Project Management Plan

Human Resource Management

00:00:00 - With 2.0 Project Planning behind us, we move into the next element
00:00:05 - of the CompTIA exam, which is 3.0 Project Execution and Delivery.
00:00:10 - And in real life, we move out of project planning into project
00:00:16 - execution and delivery. We are moving from planning into delivering
00:00:21 - the project. We're going to bring our team on and we're going
00:00:24 - to complete the deliverables. We're going to do all of the work
00:00:27 - identified in the WBS.
00:00:31 - This section of the exam, 3.0 Project Execution and Delivery
00:00:36 - will constitute 23%
00:00:39 - of your total grade.
00:00:41 - 3.0 Project Execution has four elements we're going to discuss:
00:00:45 - 3.1 Human Resource Management; 3.2 Project Kickoff, and that's
00:00:51 - going to be the focus of this Nugget; and then in succeeding
00:00:55 - Nuggets, we'll talk about 3.3 Project Governance and 3.4 Project
00:01:00 - Delivery Management. So to move into this Nugget 3.1 Human Resource
00:01:06 - Management or the full definition from the CompTIA is 3.1 coordinate
00:01:12 - human resources to maximize performance, and 3.2 Project Kickoff,
00:01:18 - or the full definition is 3.2 Explain the importance of a project
00:01:23 - kickoff meeting and outline the common activities performed during
00:01:27 - this meeting, i.e. let's get the project rolling. Let's get the
00:01:32 - team together and let's kick off the project and start completing
00:01:37 - the deliverables, start working on the WBS.
00:01:42 - This Nugget is focused exclusively on human resources and getting
00:01:48 - those human resources focused on project delivery.
00:01:52 - Topics we're going to discuss in this Nugget are forming a team.
00:01:57 - We'll discuss in just a moment that forming a project team is
00:02:00 - substantially different than adding to working with an existing
00:02:05 - operational team. We're going to focus on monitoring the team,
00:02:10 - the HR performance aspects, making sure our team members are
00:02:14 - performing optimally. We'll discuss monitoring project performance
00:02:19 - in a later Nugget in this series. As I said, this Nugget is focused
00:02:23 - on the human resource aspect. And as we discussed in Planning,
00:02:28 - there is a strong reliance on human resources in IT projects
00:02:33 - because a lot of our project delivery is going to be delivered
00:02:36 - by focused on the motivation and performance of our team. To
00:02:41 - ensure our team is fully ready to perform on our project, we're
00:02:45 - going to address specific training requirements for the team,
00:02:48 - and because we're dealing with human resources, we're going to
00:02:52 - have to deal with conflicts.
00:02:55 - It would be nice if I could give you a magic formula and say
00:02:59 - if you apply this magic formula during project kickoff, all team
00:03:04 - conflicts, all human resource conflicts are going to go away.
00:03:08 - Well, I don't believe that's possible. Our project is composed
00:03:13 - of humans. Humans have their own idiosyncrasies, and as soon
00:03:18 - as we're dealing with humans and putting them together, we're
00:03:21 - likely to have conflicts. So as effective IT project managers,
00:03:26 - we need to have good effective conflict management processes
00:03:29 - in hand, and we'll discuss that in this Nugget. And finally,
00:03:34 - we'll kick of the project and we'll make the project a go. We'll
00:03:38 - orient the team. We'll do the razzle-dazzle. We'll get them excited
00:03:43 - and we will get the project started. But first, let's talk about
00:03:48 - the aspects of what's required to form an effective project team.
00:03:53 - Forming a team or specifically forming a project team has some
00:03:58 - unique characteristics that we're not going to have to deal with
00:04:01 - operational teams. The key difference with a project team is
00:04:05 - the same as the key characteristic of a project itself, is it's
00:04:10 - temporary. Therefore, the team members that we are going to pull
00:04:16 - together may have never worked together before, may not even
00:04:22 - know each other. Elements of the project team, i.e. some of the
00:04:26 - project team members may have worked together, and other elements
00:04:30 - of the project team may have never worked together, versus an
00:04:34 - operational team where they've been working together
00:04:39 - forever. Sure, operational team members will change periodically.
00:04:48 - You'll have new team members come. You'll have new hires. You'll
00:04:51 - have resignations. You'll have promotions. But the core team
00:04:55 - has been working together forever. The roles,
00:04:59 - the responsibilities,
00:05:01 - the norms,
00:05:05 - the for operational teams are typically well-developed,
00:05:10 - and yes, as an operational manager, we need to be aware of how
00:05:14 - to break new people into the operational teams. But the focus
00:05:18 - of this Nugget is not on operational teams; the focus of this
00:05:21 - Nugget is on project teams. And again, I believe there are some
00:05:26 - very specific characteristics that we as project managers need
00:05:30 - to be aware of for project teams because it's temporary, never
00:05:35 - work together
00:05:38 - at all, or some teams
00:05:43 - have some knowledge
00:05:48 - of each other. They have new roles and responsibilities. There
00:05:53 - is a new mandate.
00:05:57 - Remember, projects are temporary. Projects are also unique. So
00:06:01 - therefore, the work our project teams are going to work on is
00:06:05 - again going to be new. There is going to be learning. There is
00:06:08 - going to be a lot of unique characteristics that we as project
00:06:11 - managers need to be aware of to effectively form our project
00:06:15 - team. And we'll discuss a lot of that in just a moment in this
00:06:19 - Nugget when we're going to discuss building a comprehensive team
00:06:22 - or a cohesive team. But before we go there, another key characteristic
00:06:27 - I want to throw at you that as project managers we need to be
00:06:31 - aware of is often there are multiple on-ramps and off-ramps as
00:06:36 - we focus on forming our project team. We have our project phases.
00:06:41 - We have analysis. We have design.
00:06:45 - We have development and so on. We will on-ramp the team for analysis,
00:06:52 - and these will be senior
00:06:55 - resources. At the end of analysis, we may off-ramp some of those
00:07:01 - senior resources. We will keep a few on for continuity, and then
00:07:05 - we will on-ramp the designers.
00:07:10 - At the end of design, we'll off-ramp some of the designers. We
00:07:15 - may off-ramp another segment of our senior resources, and then
00:07:19 - as we move into development, we will on-ramp the developers
00:07:26 - and so on. Every time we on-ramp and off-ramp, we need to be
00:07:31 - aware of we're adding two which change in the dynamics of.
00:07:37 - We're physically altering the composition.
00:07:42 - We're intellectually altering the composition.
00:07:46 - We're changing the norms. We're changing the roles and responsibilities.
00:07:50 - We need to spend appropriate time during each of these on-ramps
00:07:55 - and off-ramps to again build that cohesive team.
00:08:00 - So let's focus now on what building that cohesive team really
00:08:03 - means. So our focus as project managers is building a team, or
00:08:08 - as I said, building a cohesive team.
00:08:12 - I'm going to discuss Dr. Bruce Tuckman's model for building a
00:08:18 - cohesive team. There are other models for building a cohesive
00:08:22 - team, but my experience is the Tuckman model works very well
00:08:26 - for me. And my experience is the Tuckman model seems to be the
00:08:30 - most discussed in general writings on project management and
00:08:35 - team management processes. You're probably aware of the Tuckman
00:08:39 - model. The Tuckman model says all teams
00:08:46 - will go through these five stages: forming, storming, norming,
00:08:53 - performing, and I want to say adjourning.
00:08:59 - Tuckman says all teams must go through these five stages. And
00:09:05 - as a project manager, it's in our best interest to get our team
00:09:09 - to the performing stage as quickly as possible because we will
00:09:13 - spend significant time and effort
00:09:17 - working through the forming, the storming, the norming stages,
00:09:21 - where not all work. Not every hour of the day is going to be
00:09:26 - focused on completing our WBS elements, completing our project
00:09:29 - deliverables. But when we get into the performing stage, the
00:09:33 - focus is on completing the project deliverables. So let's talk
00:09:38 - about what forming is and what influence we as project managers
00:09:42 - can have on forming. Forming is really what we're going to do
00:09:47 - with the project kickoff we're going to discuss at the tail end
00:09:50 - of this Nugget. Forming is the initial stage of bringing the
00:09:54 - team together. All the team is brought together. They're introduced
00:09:58 - to each other. We're going to give them their objectives for
00:10:01 - the project, and we're going to overview the project objectives.
00:10:06 - This is very much a first date approach. We're going to take
00:10:12 - a bunch of strangers together and we're going to bring them into
00:10:16 - the same room. We're going to introduce them to each other. We're
00:10:19 - going to give them the norms for which the project is going to
00:10:22 - operate. And we're going to try to help them work through the
00:10:27 - forming with appropriate team-building activities, with appropriate
00:10:31 - breaking the ice activities, and get them to move to the next
00:10:36 - stage. And our job as a project manager is to make storming as
00:10:41 - short as possible.
00:10:47 - As soon as the team leaves that kickoff,
00:10:51 - I would like to suggest the forming should be done and probably
00:10:56 - the storming is going to happen. So what happens in storming?
00:11:00 - This is where the team is going to go back and say, "Okay. I
00:11:04 - remember Steve stood up in project kickoff and said, I need to
00:11:08 - do this and I'm going to report to this person. Is that true
00:11:13 - or have I forgotten?" So there is going to be some internal storming
00:11:17 - where each individual team member is going to simply say, "Hmm,
00:11:20 - do I really understand what's required of me? Do I like what's
00:11:24 - required of me? Am I going to be able to do what's required of
00:11:28 - me?" internal storming. And there is going to be the external
00:11:31 - storming. "You know, I didn't really like the look of that person
00:11:35 - that was sitting beside me," or even worse, "I didn't really
00:11:38 - like the smell of that person sitting beside me. Maybe they have
00:11:42 - some personal hygiene issues." But in the storming stage, literally,
00:11:46 - when you take them back to their desks and begin to work on the
00:11:49 - project, there are going to be conflicts, and we're going to
00:11:52 - discuss conflicts again later in this Nugget. So again, it's
00:11:56 - our job as a project manager to help work through the storming
00:12:01 - as quickly as possible and to get through all of those issues,
00:12:05 - get people comfortable with their roles in the project, and get
00:12:09 - the project team members comfortable with each other.
00:12:14 - As we work through storming, we're going to move into norming.
00:12:17 - Things are now beginning to calm down. The team members are going
00:12:21 - to get to know each other. They are going to get comfortable
00:12:23 - with their position on their team. They're going to get comfortable
00:12:26 - with their roles and responsibilities, their reporting relationships,
00:12:29 - and what's expected of them. Again, we want to keep storming
00:12:34 - as short as possible, but we recognize that there has to be that
00:12:38 - degree of comfort
00:12:41 - through the norming process where people begin to associate with
00:12:46 - the project as opposed to individuals.
00:12:50 - As project managers, we have the most ability to influence
00:12:57 - in the storming, in the forming.
00:13:00 - We can influence in the norming indirectly by encouraging good
00:13:06 - behavior and correcting bad behavior, but norming is really the
00:13:11 - personal adaptation of your team members into the project environment.
00:13:17 - And obviously, we want to move them into the performing as quickly
00:13:21 - as possible, where the project operates as a well-oiled machine.
00:13:26 - In performing,
00:13:28 - we're still going to have to deal with conflict. We're going
00:13:30 - to have new issues going to come up. We're going to have to deal
00:13:33 - with performance concerns and so on and so on. But as we move
00:13:38 - through these stages, keep in mind that our focus is to get into
00:13:42 - performing. And then of course, we have determination or ramping
00:13:47 - down. These are the on-ramps
00:13:50 - or, sorry. More appropriately, these are the off-ramps for our
00:13:53 - project, and we need to find ways to transition
00:13:58 - the knowledge
00:14:02 - from the team members leaving the project into remaining team
00:14:07 - members to keep us in the performing stage.
00:14:10 - Now, a couple of comments. I said in the beginning that all teams,
00:14:15 - according to Tuckman, must go through the building of a team,
00:14:20 - five stages, and I'd like to really a personal experience I had
00:14:24 - of watching a team try to skip many of the steps and go straight
00:14:31 - to the performing. I have taught in an MBA program, project management
00:14:36 - in an MBA program for many years. And for two or three years,
00:14:40 - I taught project management in what was called an executive MBA
00:14:44 - program, didn't follow the traditional semester life cycle, followed
00:14:48 - very much a compressed three or four or five intensive weekends,
00:14:55 - and really tried to compress the academic schedule to suit individuals
00:15:02 - who were working full-time. In the e-MBA program, students were
00:15:08 - enrolled into teams really at day zero of their e-MBA program,
00:15:11 - and they stayed in these teams through most of their courses.
00:15:14 - They literally
00:15:16 - went through courses and waves, and the teams rolled through
00:15:23 - the waves. So that was the environment I went into. I was one
00:15:26 - of the courses in the waves. But I had a complication thrown
00:15:33 - at me, or the teams had a complication thrown at
00:15:42 - me. We had these well-established
00:15:46 - performing teams that were on their fifth, sixth course in the
00:15:51 - e-MBA program, but we had thrown into the student population
00:15:56 - for this particular course a significant number of traditional
00:16:00 - MBA programs who are working through the traditional semester
00:16:04 - program. Not to pat myself in the back, this was necessitated
00:16:09 - because we had to limit enrollment of my project management course
00:16:13 - in the traditional semester program. There were still a significant
00:16:16 - number of students who wanted to take the course. Academic management
00:16:22 - decided there was sufficient capacity at the e-MBA level to add
00:16:26 - additional students into my e-MBA class, so we took the established
00:16:31 - teams and injected
00:16:35 - full-time semester students into the course,
00:16:40 - and we injected these full-time semester students into existing
00:16:46 - teams. So we had a functional performing team of
00:16:54 - e-MBAs who had already been through the forming, storming, norming
00:16:57 - process and were in performing, and we added two traditional
00:17:05 - students. What happened, in spite the fact that these were MBA
00:17:11 - students and they had probably already been through the whole
00:17:14 - HR dynamics and probably already understood the Tuckman model,
00:17:19 - they chose to ignore the fact that they had additional team members
00:17:23 - joining, ignored the fact that they need to go through some form
00:17:28 - of forming, storming, and norming, assumed that these two new
00:17:34 - traditional students would immediately work into their performing
00:17:37 - stage, and started,
00:17:40 - and things went downhill from there. We kicked off the teams,
00:17:44 - we had our first day-long session, and we disappeared and we
00:17:49 - didn't see each other for another week, let's say. When I came
00:17:52 - back in to start the next class a week later, you could see some
00:17:57 - very unhappy teams scattered around the classroom. You could
00:18:01 - see a group huddled around working closely together, and you
00:18:05 - could see the traditional students on the fringe trying to break
00:18:10 - into the group. And as I wandered around trying to inquire what
00:18:14 - was going on, you heard things like, "Why didn't you show up
00:18:19 - at the meeting last night?"
00:18:21 - accusingly at the two traditional students. The two traditional
00:18:26 - students said, "What meeting?"
00:18:29 - The e-MBA team said, "We always get together at seven o'clock
00:18:33 - before a class to discuss our workload, to discuss our plans."
00:18:40 - That was part of the forming. They should have introduced the
00:18:44 - two traditional students to their process. "We get together at
00:18:49 - seven PM every night before a classroom." They didn't know that.
00:18:55 - They didn't form but they certainly were doing a good job on
00:18:58 - storming. There was a lot of animosity in the room.
00:19:05 - They should have recognized that they had missed a stage. They
00:19:09 - didn't. These e-MBA'ers
00:19:13 - still assumed they were in the performing stage, tended to shut
00:19:17 - these guys out. As I said, there were core groups huddled around
00:19:20 - workshopping together, and the traditional students were on the
00:19:24 - fringe looking in. They never formed. They were significantly
00:19:28 - storming, and as a matter of fact, as we worked through the entire
00:19:32 - course, some of the teams did integrate well, so some of the
00:19:37 - teams did take the time to form and storm and norm, and did get
00:19:42 - to the performing stage before the course was over. But a couple
00:19:45 - of the poor teams never did make it past the storming stage.
00:19:50 - They chose to ignore or they simply didn't appreciate or understand
00:19:56 - the importance of working through the team-building dynamics.
00:20:01 - And I bring this to your attention again because we're going
00:20:05 - to have on-ramps
00:20:07 - and we're going to have off-ramps
00:20:11 - throughout most IT projects.
00:20:15 - Don't assume
00:20:17 - that the team will continue to operate in performing. Spend the
00:20:22 - appropriate amount of time upfront. You, the project manager,
00:20:26 - needs to ensure that the forming and the storming takes place
00:20:31 - as quickly as possible. This is where we have the most ability
00:20:34 - to influence our teams and help the new on-ramp team members
00:20:40 - move into the performing appropriately, and that we're taking
00:20:44 - the time to appropriately off-ramp for the knowledge transition
00:20:48 - and keep the team in the performing stage.
00:20:53 - As project managers, it's our job to monitor the performance,
00:20:56 - and it's also our job, as I said, to help move our team through
00:21:01 - the forming, the storming, the norming, the performing, and to
00:21:05 - keep them in the performing. And a lot of that is through the
00:21:08 - monitoring of performance. The first step is to define the expectations
00:21:14 - of the individual
00:21:18 - and to define to the individual the expectations of the project.
00:21:24 - And it's important that we, the project managers, know what the
00:21:28 - individual's expectations are, that they plan to learn to be
00:21:33 - a Java programmer.
00:21:36 - We also need to outline our project's expectations that says,
00:21:39 - "I understand you want to be a Java programmer, but I brought
00:21:44 - you on to this project primarily because you are a corn script
00:21:49 - guru, and I need your expertise as a corn script guru to help
00:21:56 - me complete my project deliverables, but I also recognize that
00:21:59 - you want to become a Java coder, and I will find some project
00:22:05 - tasks that are Java-focused, and I will help you with training
00:22:09 - on your Java expectations." So we need to define the expectations
00:22:14 - and we need to create the plan. "It's going to be primarily corn
00:22:18 - but I will find some Java and I will find some training opportunities
00:22:24 - for you." This
00:22:26 - is really the type of things that we as project managers are
00:22:29 - going to work through in the forming
00:22:32 - and, to an extent, the storming
00:22:36 - because when we've laid out those project expectations and we
00:22:40 - told them that they are going to be a corn script programmer
00:22:44 - and their expectation was to be Java, there is going to be some
00:22:48 - storming. But hopefully, with the plan and laying out the plan,
00:22:54 - we can move us through the storming as quickly as possible and
00:22:58 - again, get that person into the norming where they're going to
00:23:01 - become more comfortable. And again, I would suggest norming is
00:23:05 - where specific issues and resolutions of point problems are going
00:23:12 - to be dealt with and resolved. "I'm not sure what my roles and
00:23:16 - responsibilities are. I'm not sure what my reporting requirements
00:23:20 - are going to be. I'm not sure what the quality expectations of
00:23:23 - this project are. I'm not sure we're going to identify the issues."
00:23:28 - We're going to help the team members work through the resolutions,
00:23:30 - and that's going to help them move through the norming process
00:23:35 - as quickly as possible and get them into the performing.
00:23:40 - And in performing, we as project managers need to recognize performance.
00:23:47 - We need to have rewards.
00:23:50 - We need to have recognition programs.
00:23:54 - And we need to have rewards and recognitions at the team level
00:23:58 - and at the individual level.
00:24:03 - And we need to have effective and equitable reward and recognition
00:24:09 - programs at both the team and the individual level to keep our
00:24:14 - team in the performing stage. If you see someone doing something
00:24:18 - good, recognize it. And sometimes, recognizing it is as simple
00:24:23 - as a pat on the back or a heartfelt thank you. It doesn't have
00:24:29 - to be cash. It doesn't have to be gift certificates to go out
00:24:33 - and buy an unusual amount of coffee or treats, but find ways
00:24:40 - to recognize performance at the team and the individual level.
00:24:44 - Now, having said it doesn't have to be cash, I'm also a firm
00:24:48 - believer that some small sprinkling of cash and when I say "small
00:24:53 - sprinkling of cash," I'm not saying in terms of personal bonuses,
00:24:57 - but I am personally a fan of small sprinklings of cash to spring
00:25:01 - for things like team lunches and team recognition events. Don't
00:25:07 - have to be big, don't have to be elaborate, but we need to have
00:25:10 - some form of recognition to keep the team in the performing stage,
00:25:15 - and I absolutely need to also address inadequate performance
00:25:20 - to either move them to a journey,
00:25:24 - and I hope we never have to go to that stage. But if we have
00:25:27 - inadequate performance in place with a member of our project,
00:25:33 - we need to deal with it head on.
00:25:36 - We need to deal with it immediately.
00:25:41 - And we need to create
00:25:44 - a specific plan to deal with any inadequate performance issues
00:25:49 - before they become serious. Inadequate performance issues are
00:25:53 - going to eat away at your project. They are going to eat away
00:25:56 - at your project because the inadequate performers are not going
00:25:59 - to be completing their tasks on schedules,
00:26:02 - which is going to drag down your schedule, going to drag down
00:26:06 - your budget, and are going to result in non-project performance.
00:26:10 - And more times than not, if you have one or two team members
00:26:14 - who have inadequate performance issues, it's going to impact
00:26:19 - the motivation of your other project team members. "Well, why
00:26:23 - is he getting away with not doing that while I'm having to do
00:26:26 - all of this extra work because he or she isn't doing their job?"
00:26:31 - So we need, as project managers, to address the inadequate performance
00:26:36 - issues head on, immediately as possible, move them from inadequate
00:26:41 - into performance
00:26:42 - and reward and recognize that. Now, the next step is let's get
00:26:49 - the appropriate training in place to address inadequate performance
00:26:54 - issues, to focus on the plans that we had in place, to monitor
00:26:59 - and perform and manage the performance of our team. Training
00:27:03 - is often a key component to, again, moving our team into that
00:27:07 - performing stage.
00:27:10 - As we work through project kickoff and as we work through project
00:27:14 - performance, we as project managers need to ensure that we have
00:27:18 - appropriate training plans in place. We may have project-specific
00:27:23 - training. There may be skills, there may be technologies, there
00:27:26 - may be work environment skills that our project requires.
00:27:32 - We as project managers need to ensure
00:27:36 - it's in place,
00:27:40 - it's delivered, and it's available
00:27:47 - to all team members
00:27:51 - that need
00:27:54 - it. As we work through projects, we will often encounter team
00:27:59 - members request for training that are not project-specific that
00:28:03 - are career training, and maybe we could take the Java example
00:28:08 - as an example of career training. Our developer is a corn guru
00:28:14 - but wants to become a Java guru. Do I need it for my project?
00:28:19 - No. Actually, I don't want them to be a Java guru for my project.
00:28:24 - I want them to be a corn guru or continue to be a corn guru.
00:28:28 - But I have to recognize that this individual has a career aspiration
00:28:33 - to move into Java, and it's really in my best interest to facilitate
00:28:38 - that as much as possible
00:28:42 - within the confines
00:28:48 - of my project.
00:28:52 - And when I say "within the confines of my project," I don't mean
00:28:56 - try to bury the career training and make it invisible to the
00:29:00 - organization and absorb it into my project. When I say it's in
00:29:04 - my best interest to accommodate my team members' career trainings
00:29:09 - within the confines of my project, i.e. if I can
00:29:15 - without impacting the project,
00:29:20 - then it's in my best interest to do it. And as I said to this
00:29:23 - Java person, "Yes, I think I can find some Java code for you
00:29:27 - to write, and yes, I will get Sally, who is my Java guru, to
00:29:33 - sit with you and support you and help you work through your Java
00:29:37 - code." If I can do that without impacting my project, then it's
00:29:41 - in my project's best interest to support their career
00:29:45 - training requirements because I will have a more motivated employee.
00:29:50 - But if I can't do it within the confines of my project, I don't
00:29:54 - have the Java expertise, or I don't have the freedom of schedule
00:29:59 - to let this person do a little dabbling and training, then I
00:30:02 - need to have that sincere and honest discussion with that team
00:30:06 - member that says, "I recognize you want to be a Java resource.
00:30:11 - You've been resourced in my project to be a corn guru. I need
00:30:15 - you to be a corn guru." I may have to get into some little flattery.
00:30:19 - I may have to appeal to their ego and say, "You are the person
00:30:26 - that's going to make this project a success." Build them up.
00:30:29 - Get them committed to being a corn guru, and give them your commitment
00:30:35 - that says, "I can't give you Java training on this course, but
00:30:40 - I will personally go to senior management, tell senior management
00:30:45 - what a good job you're going to do for me on this project, and
00:30:48 - I will reiterate that to senior management at the end of the
00:30:51 - project. You did a terrific job on this project. This project
00:30:54 - is a success for this. And our organization owes it to you to
00:31:00 - give you the Java training that you require as soon as the project
00:31:05 - is concluded.
00:31:07 - Our focus has to be on project training, but we need to support
00:31:11 - career training as possible within the confines of our project.
00:31:15 - And it doesn't matter whether it's skills training, whether it's
00:31:19 - technical training, whether it is HR training, whether it is
00:31:25 - interpersonal communications training. Whatever training is required
00:31:30 - for our project, we have to ensure it's in place and delivered.
00:31:35 - We have to support as much career training as possible and use
00:31:39 - that as a motivator to help move our project forward. And
00:31:45 - the final aspect we need to discuss in this Nugget is conflict
00:31:49 - management. We are going to have conflict management throughout
00:31:52 - our project. We are going to have conflicts in the forming, definitely
00:31:56 - in the storming, some in the norming, and we are going to have
00:32:02 - conflicts even in the performing stage. As project managers,
00:32:06 - we need to resolve
00:32:10 - conflicts as soon as possible.
00:32:15 - Bottom line, as project managers, as soon as we recognize a conflict,
00:32:18 - we need to get it resolved as soon as possible or our project
00:32:22 - performance is going to deteriorate. Our team is going to move
00:32:25 - out of their performing stage and potentially go way back to
00:32:28 - the storming stage. CompTIA has identified three sources of conflict
00:32:34 - specifically relevant for IT projects.
00:32:39 - So you can almost expect to have some questions on your exam
00:32:43 - specifically related to these three sources of conflicts: Competing
00:32:48 - resource demands. IT resources are often in scarce demand in
00:32:53 - every organization. Although your team member may be assigned
00:32:57 - to your project full-time,
00:33:00 - they are going to get conflicting resource demands. They are
00:33:03 - going to get previous projects. They're going to get other managers
00:33:06 - saying, "Tom, Sally, George, could you just come and help me
00:33:11 - with this? You are the guru. I need you to help me get this done."
00:33:15 - It's going to cause conflict as your team member wants to focus
00:33:18 - on project activities but they are getting demands from other
00:33:22 - senior managers in your organization to take time away from your
00:33:25 - project to work on their needs.
00:33:29 - My experience is IT people are very opinionated, and IT people
00:33:36 - often believe that their way is the best way, so you are going
00:33:40 - to often get conflicts within your team with different expert
00:33:44 - opinions. "My way is the right way." "No, my way is the right
00:33:49 - way." And chances are, both ways are the right ways, so again,
00:33:54 - as project managers, we need to resolve those conflicts as quickly
00:33:58 - as possible, and again, my experience is the people who work
00:34:03 - in IT, and I'm one of those people who work in IT, have
00:34:07 - unique personal characteristics. And you may have a IT person
00:34:13 - who has the proverbial desk six inches high with paper, let's
00:34:18 - call them a slob, working beside the other IT person who is a
00:34:23 - neat freak, and they just irritate each other. Or you can have
00:34:27 - people who are early morning people. They like to be in before
00:34:30 - the sun rises. And by three o'clock in the afternoon, they're
00:34:33 - packing up their desks to go home, while the late risers who
00:34:37 - get up at 10 or 11 are just getting in to the flow of things
00:34:42 - so they are going to have conflicts. "Why is he leaving early?
00:34:44 - Why is he never here when I want it?" or, "They are never available
00:34:48 - for meetings," and so on. So again, according to CompTIA, these
00:34:52 - are the three main sources of conflict in IT projects. You're
00:34:56 - going to have millions of other sources of conflicts. You're
00:35:00 - going to have sources of conflicts between IT and the business.
00:35:03 - You're going to have sources of interpersonal conflicts between
00:35:06 - your IT members. You're going to have conflict with, you name
00:35:10 - it, you're going to have conflict because the wrong team won
00:35:14 - the hockey game the night before, I don't know.
00:35:17 - Be prepared for these specific sources of conflicts, but be prepared
00:35:21 - that conflicts can come at your project from every direction.
00:35:25 - As project managers, we need to manage the conflict as quickly
00:35:31 - as possible and resolve it. The six main techniques for conflict
00:35:35 - resolution that are discussed within the confines of CompTIA
00:35:39 - are smoothing, forcing, compromise, confronting,
00:35:44 - avoiding, and negotiating.
00:35:47 - Again, my expectation, you probably have a lot of knowledge of
00:35:49 - these particular managing conflict techniques already, but I
00:35:54 - do feel I need to spend just a few moments on them because again,
00:35:57 - my expectation, you will get questions on your CompTIA, will
00:36:01 - present a conflict situation and will say, "Which one of these
00:36:06 - conflict management techniques would be best applied?" So let's
00:36:10 - just spend a moment on this. Smoothing
00:36:13 - is really, it's a temporary way of resolving a conflict. You
00:36:18 - find a way to minimize. You find a way to basically work out
00:36:25 - a compromise
00:36:26 - amongst the team members. Because it is temporary, I would suggest
00:36:32 - smoothing is a lose-lose
00:36:34 - style of resolving a conflict. You are simply minimizing it.
00:36:40 - You're putting it away. You're trying to minimize the conflict
00:36:45 - areas but it's going to come back up and reemerge at some point
00:36:49 - in time, so it's not a well-recommended form of conflict management.
00:36:55 - Forcing. Basically, one of the conflict members will force, whether
00:37:02 - because they have power and authority, whether they have personal
00:37:05 - magnetism, whether they have expert opinion. But one of the conflict
00:37:11 - members will force a solution on to the other, and this is very
00:37:16 - much a win-lose
00:37:19 - type of conflict resolution. The person who does the forcing
00:37:24 - is going to feel very happy with themselves, feeling, "There.
00:37:27 - I won that one. Ha!" But the person who loses is not going to
00:37:32 - feel happy at all and therefore will potentially again re-energize
00:37:38 - his conflict at a later time. So again, forcing is not a highly
00:37:42 - recommended solution.
00:37:46 - Compromise is where the two members will work together and find
00:37:51 - a compromise. It's not smoothing. It's not ignoring it. It's
00:37:54 - not just putting it away and hoping it goes away. But they will
00:37:57 - actively make changes and find a compromise that is palatable
00:38:02 - to both. And a compromise can turn out to be a win-win
00:38:07 - if the two parties truly believe in the compromise and the two
00:38:11 - parties truly believe that the compromise solution satisfies
00:38:16 - their personal requirements as well as satisfies the project
00:38:19 - requirements. However, a compromise can also become a lose-lose
00:38:25 - where they've simply basically given in. "Yes, if you do that,
00:38:30 - I'll do that." It puts the conflict aside. We're allowed to continue.
00:38:35 - But again, if they don't believe in the compromise, it's going
00:38:39 - to come back and it's going to eventually re-energize itself
00:38:43 - and will have to be dealt with again. Confronting is problem-solving.
00:38:49 - This is truly the best way to resolve a conflict, and it should
00:38:55 - result in a win-win. Confronting is where you put all of the
00:39:00 - problems on the table and you literally workshop and find a good,
00:39:06 - fair, equitable solution.
00:39:09 - You put all of the issues, you put all of the problems on the
00:39:13 - table, and you work to find a good equitable solution. It's not
00:39:19 - a compromise. It's a good solution. It's agreed to by all parties,
00:39:24 - and it's believed in by all parties.
00:39:28 - It is probably the preferred form of conflict resolution. Avoiding,
00:39:35 - I think you can probably accept, is going to be a lose-lose.
00:39:41 - Avoiding simply says, "Well, there is a conflict. I don't want
00:39:45 - to deal with it so I'm going to ignore it. I'm going to avoid
00:39:47 - it." It continues to be a conflict and it doesn't get resolved
00:39:52 - and it impacts project performance. And finally, negotiating
00:39:57 - also should come to a win-win. The key difference between, let's
00:40:01 - say, a confronting and a negotiating is a confronting, the conflict
00:40:06 - members resolve it themselves, where with negotiating, you will
00:40:10 - bring in a third party to help resolve the conflict.
00:40:16 - Conflicts are inevitable. As project managers, it's our job to
00:40:21 - resolve them ASAP. For your exam, you need to recognize that
00:40:26 - there are three main sources of conflicts, but conflicts can
00:40:29 - come from everywhere. And for your exam, you need to understand
00:40:33 - that there are eight main ways of managing to deal with conflicts,
00:40:38 - and you need to understand what the impacts, whether it's a lose-lose
00:40:44 - or a win-win, and what the degree of effort, i.e. confronting
00:40:49 - should take less effort than a negotiating because negotiating,
00:40:52 - you need to bring in a third party, where confronting is the
00:40:56 - two conflicting members deal with it on their own. Be aware of
00:41:01 - the six methods of managing conflict and be aware of and expect
00:41:06 - to apply which methods are going to be most appropriate in a
00:41:11 - given project
00:41:13 - conflict scenario.
00:41:16 - And the final consideration for this Nugget is the formal project
00:41:20 - kickoff. It is a formal process. It needs to be scheduled
00:41:27 - and it needs to be mandatory.
00:41:32 - It should follow a given agenda. Here is a suggestion for agenda:
00:41:37 - welcome and introductions. Make everybody feel at home. Remember
00:41:40 - we're in the forming stage. Outline the roles and responsibilities
00:41:44 - for the project. Who is the project sponsor? Tell them what the
00:41:48 - project is all about. Outline the project schedule. Give them
00:41:52 - the project budget and tell them what the criteria for project
00:41:56 - completion is going to be. We're all about forming,
00:42:01 - making sure this team of unknown individuals or maybe known individuals
00:42:08 - or maybe sub-teams of known individuals who are being thrown
00:42:12 - together, put together for a project's success works through
00:42:17 - that forming process, has to be formal, has to be scheduled.
00:42:23 - I believe it needs to be mandatory and it is going to work us
00:42:27 - through that all-important first step of our team-building, which
00:42:31 - is forming, and as we've discussed already, needs to be repeated.
00:42:41 - As we off-ramp and on-ramp, as we go through the analysis to
00:42:45 - the design, and as we go through the design to the development,
00:42:50 - we need to repeat the project kickoff. We can't assume that the
00:42:56 - new team members are going to properly form, storm, norm, and
00:43:01 - move into perform. As project managers, we need to repeat the
00:43:07 - formal kickoff and we need to bring all of the team members the
00:43:12 - reoccurring, the existing team members as well as the new team
00:43:16 - members into each project kickoff session to form, to avoid having
00:43:23 - the scenario that my e-MBAs had with the traditional MBAs where
00:43:27 - they never formed but they sure did a bang-up job of storming.
00:43:35 - This Nugget was focused on human resource management and then
00:43:38 - taking all of our human resource management techniques and kicking
00:43:42 - off the project with a formal
00:43:46 - project kickoff session, and the recognition that the formal
00:43:50 - kickoff needs to be repeated
00:43:54 - as we on-ramp and
00:43:56 - off-ramp team members.
00:44:01 - The focus is forming a team, recognizing that project teams
00:44:07 - are different,
00:44:10 - that we're bringing together a group of unknown individuals
00:44:16 - and giving them a unique requirement to work on a project. As
00:44:20 - project managers, we need to recognize that forming a team, a
00:44:25 - project team
00:44:27 - has some very different characteristics than adding a new team
00:44:31 - member to an existing operational team. As project managers,
00:44:36 - we are going to monitor performance and we are going to take
00:44:38 - the actions we need to keep our team in the performing
00:44:45 - aspect of the Tuckman model.
00:44:49 - We are going to provide the appropriate training. We are going
00:44:52 - to recognize that conflict management is going to exist. In preparation
00:44:56 - for your CompTIA exam, recognize that there are three main sources
00:45:01 - of conflict,
00:45:03 - and there are six main techniques
00:45:08 - for dealing with conflicts. And as I said, we are going to formalize
00:45:12 - this with the project kickoff, and we're going to be prepared
00:45:16 - to repeat the project kickoff at each on-ramp and off-ramp to
00:45:21 - move our team through the forming, the storming,
00:45:28 - the norming,
00:45:30 - and keeping our team in the performing.
00:45:37 - This concludes our Nugget on Human Resource Management and Project
00:45:41 - Kickoff. I hope this module has been informative for you, and
00:45:44 - thank you very much for viewing.

Project Governance

Project Tracking

Project Change Management

Project Risk Management

Project Quality Management

Project Delivery Management

Earned Value Management

Project Communication Management

Project Closure

Please help us improve by sharing your feedback on training courses and videos. For customer service questions, please contact our support team. The views expressed in comments reflect those of the author and not of CBT Nuggets. We reserve the right to remove comments that do not adhere to our community standards.

comments powered by Disqus

Course Features

Speed Control

Play videos at a faster or slower pace.

Bookmarks

Pick up where you left off watching a video.

Notes

Jot down information to refer back to at a later time.

Closed Captions

Follow what the trainers are saying with ease.

Premium Features

Transcender® Practice Exams

These practice tests help you review your knowledge and prepare you for exams.

Offline Training

Our mobile apps offer the ability to download videos and train anytime, anywhere offline.

Accountability Coaching

Develop and maintain a study plan with assistance from coaches.
Steve Caseley

Steve Caseley

CBT Nuggets Trainer

Certifications:
PMI-PMP, PMI-ACP, PMI-SP, Project+

Area Of Expertise:
Project Management, MS Project, Development Methodologies, Agile Development


Stay Connected

Get the latest updates on the subjects you choose.


  © 2014 CBT Nuggets. All rights reserved. Licensing Agreement | Billing Agreement | Privacy Policy | RSS